Home / Sectors / Energy, Oil & Gas

Downtime on a rig is measured in six figures.

Drilling spares, turbine blades, transformers and project cargo move on deadlines set by shutdown windows and day-rates, not by airline schedules. Aeroinis charters the aircraft that fits the piece — and runs the road, permits and customs around it.

What moves

Heavy, outsize, and usually late by definition.

Typical movements on the Türkiye, Caspian, Gulf and North Africa corridors.

Drilling & completion spares

BOP parts, downhole tools and pumps that hold a rig schedule hostage.

Turbine & plant components

Blades, rotors and control systems for planned outages that cannot slip.

Transformers & switchgear

Dense, awkward electrical plant moved with loadability checked before quotation.

Camp & project surges

Mobilisation waves where volume, not weight, is the constraint.

How the desk runs it

From shutdown plan to site gate.

01 · ScopeDimensions, weight, lift points and the shutdown window — the facts that pick the aircraft.
02 · AircraftFrom ATR to AN-124: loadability confirmed before you see a price.
03 · PermitsOverflight, landing and road permits run in parallel by the desk.
04 · SiteFinal leg to port, base or site gate, with offloading requirements agreed in advance.
AN-124outsize capability
24/7desk coverage
< 2 hpriced options, not a call-back
In-housecustoms brokerage

Questions

Asked by supply chain leads in energy.

The piece is 4.2 m long and 9 tonnes. What are my options?

That length excludes most narrow-body freighters through the side door. Realistic candidates are A300/767-class and up, or an AN-12/IL-76 where available — the desk checks door apertures and floor loading before quoting, so the option you see is one that loads.

Can you deliver to a port for an offshore supply vessel?

Yes — door-to-vessel is a standard movement: the flight, the truck under seal and the port handover to the agent are planned as one chain with the vessel's sailing window.

Do you handle dangerous goods common in this sector?

Class 3, 8 and 9 items and radioactive sources for logging appear regularly. Declare early; carrier and airport acceptance is validated before the method is proposed.

Send dimensions and the shutdown date. Options follow.